Chapter 5 Payment Plans Complete Buyer Guide
Royals Property Consultant is a trusted name for buying, selling, renting, and investing in residential and commercial properties in Zirakpur, Mohali, Chandigarh, and New Chandigarh.

Property Payment Plans
Complete Buyer Guide
Galat payment plan choose karna lakhs rupaye ki mistake ban sakti hai. CLP, Down Payment, Subvention, 80:20, 90:10 — har plan simple Hindi mein, real calculations, builder tricks aur EMI basics ke saath.
Property Payment Plan wo schedule hai jisme decide hota hai ki property ki total cost — booking se lekar possession tak — kab aur kitne installments mein pay hogi. Ye sirf paperwork nahi hai — payment plan directly decide karta hai tumhara cash flow, loan ka size, interest cost, aur sabse zaroori, agar builder delay kare to risk kiske upar zyada hai. CLP mein risk buyer aur builder dono share karte hain; Down Payment mein risk buyer zyada leta hai discount ke badle; Subvention mein risk builder par shift hota hai — lekin fine print carefully padhna hamesha zaroori hai.
Is Chapter Mein Kya Hai
Kisi bhi section se seedha shuru karo, ya top se bottom poora padho.
- 01 Payment Plan Kya Hai
- 02 Construction Linked Plan
- 03 Down Payment Plan
- 04 Flexi Payment Plan
- 05 Subvention Plan
- 06 Possession & Time Linked
- 07 80:20 · 90:10 · 20:80
- 08 Loan Disbursement
- 09 EMI aur Pre-EMI
- 10 Bank vs Builder Funding
- 11 Plan Comparison Table
- 12 Kis Buyer Ke Liye Kaunsa Plan
- 13 30 Builder Tricks
- 14 Case Studies
- 15 Real Calculations (₹50L–₹2Cr)
- 16 Buyer Checklist
- 17 30 Common Mistakes
- 18 FAQ
- 19 Glossary
- 20 Summary
Payment Plan Kya Hai?
Direct Answer: Payment Plan wo agreed structure hai jisme decide hota hai ki property ki total price kitne installments mein, kis trigger (construction stage, calendar date, ya possession) ke saath pay hogi. Builder isliye alag-alag plans offer karte hain kyunki har buyer ka cash-flow situation alag hota hai — kuch ke paas liquid funds hain, kuch loan par depend karte hain.
Builder aur Buyer — Dono Ka Angle
Builder ko Kya Milta Hai
Early cash flow project fund karne ke liye, aur Down Payment jaisi schemes mein guaranteed committed buyers
Buyer ko Kya Milta Hai
Risk aur cash-outflow ko apni financial situation ke hisaab se manage karne ki flexibility
Bank ka Role
Property ko technically/legally verify karta hai aur loan ko payment-plan-linked stages mein disburse karta hai
Payment Lifecycle — Booking se Possession Tak
Zaroori Terms Ka Fark
| Term | Kya Hai |
|---|---|
| Payment Plan | Overall structure — kis trigger par kitna % pay hoga |
| Payment Schedule | Us plan ka actual date/stage-wise breakdown, agreement mein specified |
| Demand Letter | Builder ka formal notice jab ek stage complete ho aur payment due ho |
| Loan Disbursement | Bank dwara actual fund release, demand letter ke against |
| Builder Agreement | Legal contract jisme payment plan, timeline aur penalties defined hote hain |
Construction Linked Plan (CLP)
Direct Answer: CLP mein payment construction ke actual progress ke saath release hoti hai — foundation, slab, structure, finishing, possession jaise milestones par. Ye India ka sabse common aur balanced payment plan hai.
✅ Advantages
Risk builder ke actual progress se linked — delay hone par extra payment nahi karna padta
❌ Disadvantages
Pre-EMI interest construction period ke poore time chalta rehta hai, jab tak possession na mile
🎯 Kaun Choose Kare
Under-construction projects mein zyada tar buyers ke liye default aur balanced choice
🚫 Kaun Avoid Kare
Jo builder ka construction track record verify nahi kar paaye — delay hone par interest cost badhta rehta hai
Down Payment Plan (DPP)
Direct Answer: Down Payment Plan mein booking ke turant baad 90-95% amount ek saath pay kar diya jaata hai, baaki possession par. Builder isके badle typically 5-10% discount deta hai kyunki unhe upfront bada cash flow milta hai.
✅ Advantages
Best price discount, loan interest kam period ke liye lagta hai, negotiation power zyada
❌ Disadvantages
Construction delay ka poora risk buyer par — paisa de diya, possession abhi bhi door
🎯 Best For
Cash-rich buyers, ready-to-move ya near-completion projects mein especially
Flexi Payment Plan
Direct Answer: Flexi Payment Plan mein builder buyer ki cash-flow situation ke hisaab se customized schedule allow karta hai — CLP aur Down Payment ka hybrid, negotiation-dependent.
- Initial Payment — Typically 15-25%, negotiable
- Future Payments — Mix of construction-linked aur time-linked triggers, case-by-case decide hota hai
- Best For — Buyers jinki income seasonal hai (business owners) ya jo specific months mein bade payments plan kar sakte hain
Subvention Plan
Direct Answer: Subvention Plan ek tripartite arrangement hai (Buyer + Builder + Bank) jisme buyer loan leta hai lekin possession tak EMI/interest builder khud bank ko pay karta hai. Buyer ko sirf ek chhota upfront amount dena hota hai.
History aur RBI Ka Stance
Kuch saal pehle “zero EMI till possession” schemes bahut promote hui thi, lekin RBI aur National Housing Bank ne inhe caution ke saath dekha kyunki builder default hone par poori liability suddenly buyer par aa jaati thi, bina buyer ko clearly pata chale. Modern, well-structured subvention schemes ab clearer tripartite agreements ke saath aati hain, lekin fine print padhna aur bhi zaroori ho gaya hai.
✅ Benefits
Low upfront cash outflow, koi EMI tension possession tak nahi
❌ Risks
Builder default → liability buyer par; credit score bhi affect ho sakta hai agar builder EMI miss kare
Possession Linked & Time Linked Plans
| Plan | Kaise Kaam Karta Hai | Best For |
|---|---|---|
| Possession Linked | Majority payment sirf possession ke time due hoti hai | Very risk-averse buyers, ready-to-move projects |
| Time Linked | Fixed calendar dates (monthly/quarterly/annual) par payment, construction progress se independent | Ready-to-move ya near-completion projects, predictable cash-flow planners ke liye |
80:20 · 90:10 · 20:80 Plans
Direct Answer: Ye ratios batate hain ki possession se pehle vs possession par kitna % pay hota hai. 80:20 mein 20% possession par; 90:10 mein sirf 10% possession par; 20:80 mein bilkul opposite — sirf 20% pehle, 80% baad mein (typically builder/NBFC funding ke saath).
80:20 Payment Plan — Example on ₹75 Lakh Flat
| Stage | % | Amount |
|---|---|---|
| Booking + Construction (combined) | 80% | ₹60,00,000 |
| Possession | 20% | ₹15,00,000 |
90:10 Payment Plan — Example on ₹75 Lakh Flat
| Stage | % | Amount |
|---|---|---|
| Booking + Construction (combined) | 90% | ₹67,50,000 |
| Possession | 10% | ₹7,50,000 |
90:10 mein buyer ka possession-time risk kam hota hai (kam bacha hua amount), lekin builder-funding risk zyada hota hai kyunki unhe project zyada khud fund karna padta hai — isliye ye plans typically bade, established builders offer karte hain.
20:80 Payment Plan (Modern/NBFC-Backed)
Isme buyer sirf 20% pay karta hai booking par, baaki 80% ek NBFC ya builder-arranged financing structure se aata hai jab tak possession na ho. Ye essentially subvention ka ek modern variant hai — same risks apply karte hain.
Home Loan Disbursement
Direct Answer: Under-construction property mein loan typically stage-wise disburse hota hai — jaise-jaise construction/payment milestone complete hota hai, bank apna portion release karta hai, builder ke demand letter aur apni technical verification ke against.
| Type | Kab Hota Hai |
|---|---|
| Partial Disbursement | Under-construction property, CLP jaise plans ke saath |
| Full Disbursement | Ready-to-move property, ek hi baar mein poora loan release |
| Stage-wise Disbursement | Har construction milestone ke saath proportional amount |
EMI aur Pre-EMI Explained
Direct Answer: Full EMI mein principal aur interest dono ek saath repay hote hain, fixed monthly amount mein. Pre-EMI mein sirf disbursed amount par interest diya jaata hai — principal repayment possession/full-disbursement ke baad hi shuru hota hai.
| Term | Meaning |
|---|---|
| EMI | Equated Monthly Installment — fixed monthly payment jisme principal + interest dono hote hain |
| Principal | Actual loan amount jo repay karna hai |
| Interest | Bank ka charge loan dene ke liye, annual % rate mein |
| Tenure | Loan repay karne ka total time period (years mein) |
| Reducing Balance | Interest calculate hota hai remaining principal par, jo har payment ke saath ghatta hai |
| Fixed EMI | Interest rate poore tenure fixed rehta hai |
| Floating EMI | Interest rate market conditions ke saath change hota hai |
| Pre-EMI | Sirf disbursed amount par interest, construction period ke dauraan |
Bank Funding vs Builder Funding
| Aspect | Bank Funding | Builder/NBFC Funding |
|---|---|---|
| Verification | Detailed technical + legal verification | Typically lighter, builder-managed process |
| Interest Rate | Regulated, generally competitive | Can be higher, less standardized |
| Risk to Buyer | Lower — regulated entity | Higher — depends on builder/NBFC financial health |
| Common In | Standard home loans | Subvention, 20:80 schemes |
Builders khud bhi apne construction fund karte hain — through developer’s own equity, NBFC loans, ya private equity. Jab builder financial stress mein hota hai, ye directly buyer ke construction timeline ko affect karta hai — isliye builder ki financial health check karna sirf “trust” ka matter nahi, ek concrete due-diligence step hai.
Payment Plan Comparison Table
| Plan | Initial Investment | Interest Cost | Risk | Best For |
|---|---|---|---|---|
| CLP | Low-Moderate | Moderate | Balanced | Most under-construction buyers |
| Down Payment | Very High (90-95%) | Lowest | High (delay risk) | Cash-rich, trusted builders only |
| Flexi | Variable | Variable | Depends on terms | Business owners, seasonal income |
| Subvention | Low | Builder-paid till possession | High (builder default risk) | Cash-flow-constrained buyers, verified builders only |
| Possession Linked | Low upfront | Low | Low for buyer | Ready-to-move/near-completion |
| Time Linked | Fixed schedule | Moderate | Moderate-High (schedule vs progress mismatch) | Predictable, ready projects |
| 80:20 | High (80%) | Moderate | Moderate | Established builders |
| 90:10 | Very High (90%) | Lower | Higher for buyer | Very trusted, large builders |
| 20:80 | Low (20%) | NBFC/Builder-dependent | High | Risk-tolerant buyers with strong builder due-diligence |
Kis Buyer Ke Liye Kaunsa Plan Best Hai
| Buyer Type | Recommended Plan |
|---|---|
| Salary Employees | CLP — predictable EMI growth ke saath matches |
| Business Owners | Flexi Plan — seasonal cash flow ke saath align hota hai |
| NRI Buyers | CLP ya Down Payment (verified builder) — remote monitoring easier |
| Investors | 90:10 ya Possession Linked — capital efficiency maximize karta hai |
| Retired Buyers | Down Payment (agar funds available) — EMI tension avoid karta hai |
| First Home Buyers | CLP — balanced risk, standard bank-backed process |
| Commercial Investors | CLP ya 80:20 — business cash-flow ke saath predictable |
| Luxury Buyers | Down Payment ya Flexi — discount aur negotiation leverage priority |
30 Builder Tricks in Payment Plans
Direct Answer: Sabse common tricks hidden clauses, inflated demand letters, aur one-sided delay/penalty terms hote hain — likhit agreement carefully padhna hi sabse bada protection hai.
- Milestone “complete” declare karna jabki actual construction utna advance nahi
- Demand letter mein charges add karna jo original price sheet mein nahi the
- Late payment par excessive penalty interest rate lagana
- Delay hone par buyer ko koi compensation clause na dena, lekin buyer late ho to penalty strict
- Escalation clause chhupana jisse construction cost badhne par buyer se extra maanga jaaye
- Subvention scheme mein default-liability clause vague rakhna
- Verbal discount promise karna jo written agreement mein include na karna
- Payment schedule ko agreement mein flexible/vague rakhna taaki jab chahein demand letter bhej sakein
- Possession date ko “tentative” rakh kar legally binding na banana
- Floor Rise ya PLC charges ko baad mein “revise” karna
- Force majeure clause ko overly broad likhna, taaki har delay usme cover ho jaaye
- Cancellation charges ko disproportionately high rakhna
- GST/tax changes ka poora burden buyer par shift kar dena bina prior disclosure ke
- Bank NOC process mein delay karke buyer ka loan disbursement atkana
- Same project mein different buyers ko different verbal terms dena
- IFMS aur other one-time charges ko payment plan mein hide karna
- Under-construction ko “ready to move” bata kar Possession Linked jaisa fast payment maangna
- RERA-registered timeline se alag, more aggressive internal timeline verbally promise karna
- Assignment/transfer clause mein hidden high fees rakhna
- Loan tie-up wale bank ke saath “preferred” rate ka misrepresentation karna
- Amenities jo abhi complete nahi hain, unhe “included and ready” bata dena
- Maintenance charges ko possession se pehle hi collect karna bina clear justification ke
- Payment plan document mein ambiguous language use karna jo multiple interpretation allow kare
- Interest-free period claims mein fine-print conditions chhupana
- Discount sirf specific payment mode (jaise full cheque) tak limited rakhna, disclose kiye bina
- Registered agreement mein wahi terms na dalna jo brochure/verbal mein promise kiye the
- Demand letters ko bulk mein, short notice ke saath bhejna taaki buyer verify na kar paaye
- Society handover se pehle hi maintenance corpus fund collect karke usko delay se use karna
- Multiple similar-sounding charges (EDC, IDC, EEC) ko separately list karke total inflate karna
- Buyer ko verbally assure karna ki “sab builders yahi karte hain” jab specific clause actually unfair ho
Real-Life Case Studies
Real Payment Plan Calculations
Direct Answer: Neeche 4 property price points ke liye illustrative CLP breakdown diya gaya hai — booking, loan requirement, aur possession cost approximate hain, actual numbers builder/bank ke exact terms par depend karte hain.
| Property Price | Booking (10%) | Typical Loan Requirement (~75-80%) | Possession Payment (~10%) |
|---|---|---|---|
| ₹50,00,000 | ₹5,00,000 | ₹37,50,000 – ₹40,00,000 | ₹5,00,000 |
| ₹75,00,000 | ₹7,50,000 | ₹56,25,000 – ₹60,00,000 | ₹7,50,000 |
| ₹1,00,00,000 | ₹10,00,000 | ₹75,00,000 – ₹80,00,000 | ₹10,00,000 |
| ₹2,00,00,000 | ₹20,00,000 | ₹1,50,00,000 – ₹1,60,00,000 | ₹20,00,000 |
Buyer Checklist
Documents Verify Karo
- RERA registration certificate
- Approved building plan aur layout
- Builder-Buyer Agreement (poora, har clause padhkar)
- Payment schedule (written, dated triggers ke saath)
- Bank sanction letter aur loan terms
Builder Se Ye Sawal Zaroor Pucho
- Exact payment plan aur har stage ka trigger kya hai?
- Delay hone par penalty/compensation clause kya hai?
- Kya price breakdown mein sab charges (PLC, EDC, IFMS) included hain?
Bank Se Ye Sawal Zaroor Pucho
- Disbursement kaunse stage par, kitna % hoga?
- Pre-EMI vs Full EMI — konsa applicable hoga aur kab switch hoga?
- Processing fee aur prepayment charges kya hain?
30 Common Payment Plan Mistakes
- Payment plan ko sirf % dekhkar choose karna, builder ki financial health check kiye bina
- Demand letter par bina site-visit verify kiye payment kar dena
- Verbal discount ko written agreement mein confirm na karna
- Pre-EMI ko “sasta” samajhna, total interest cost calculate kiye bina
- Subvention scheme ka default-liability clause na padhna
- Loan eligibility calculate kiye bina booking amount de dena
- Escalation clause ignore karna agreement mein
- Cancellation charges check na karna before booking
- Payment schedule aur loan disbursement timing mismatch ka buffer na rakhna
- Builder ke past projects ka delivery timeline research na karna
- 90:10 jaisa plan chhote/unverified builder ke saath lena
- RERA registration verify kiye bina koi bhi payment karna
- Floating vs Fixed interest rate ka fark samjhe bina loan lena
- Processing fee aur hidden bank charges ignore karna
- Agreement mein possession date ko “tentative” rehne dena
- Multiple similar charges (EDC, IDC, EEC) ko total mein add na karna budget planning mein
- Down Payment Plan lena sirf discount ke liye, builder risk assess kiye bina
- Time Linked Plan lena under-construction, uncertain-timeline project mein
- NRI hone par remote site-verification process set na karna
- Bank NOC process ki timeline apne cash-flow planning mein factor na karna
- IFMS aur maintenance charges ko payment-plan-total se separately na track karna
- Broker ki verbal payment-plan explanation ko builder se written confirm na karna
- Force majeure clause ki scope carefully na padhna
- Society handover timeline ko possession date se automatically same maan lena
- Loan tenure itna lamba lena ki total interest cost badha de bina zaroorat
- Assignment/resale clause ke hidden charges check na karna future-flexibility ke liye
- Payment plan ko apni actual monthly cash-flow ke against stress-test na karna
- GST/stamp duty changes ka impact payment-plan budget mein include na karna
- Independent legal opinion liye bina builder ke standard agreement par sign karna
- Ek hi builder ke multiple projects compare kiye bina payment-plan-based decision lena
Frequently Asked Questions
CLP aur Down Payment Plan mein kya fark hai?
CLP mein payment construction milestones ke saath release hoti hai, jabki Down Payment Plan mein 90-95% amount upfront diya jaata hai, discount ke against.
Subvention scheme mein risk kya hota hai?
Builder possession tak interest pay karta hai, lekin agar builder default kare to liability buyer par aa sakti hai — agreement clause carefully padhna zaroori hai.
Pre-EMI aur Full EMI mein kya fark hai?
Pre-EMI mein sirf disbursed amount par interest diya jaata hai, principal repayment shuru nahi hota. Full EMI mein principal aur interest dono ek saath repay hote hain.
90:10 payment plan mein 10% kab diya jaata hai?
90:10 mein 90% payment booking/construction phase mein di jaati hai aur sirf 10% possession ke time diya jaata hai — buyer ka risk kam, builder ka funding risk zyada hota hai.
Loan stage-wise disburse hota hai ya ek saath?
Under-construction property mein loan typically stage-wise (construction-linked) disburse hota hai bank ki technical verification ke baad, ready-to-move property mein full disbursement ek saath ho sakta hai.
Kaunsa payment plan sabse safe hai?
Universally koi “sabse safe” plan nahi hai — CLP typically most balanced risk-distribution deta hai zyada tar under-construction buyers ke liye, lekin final choice builder ki financial health aur apni cash-flow situation par depend karta hai.
80:20 aur 90:10 mein kya better hai?
90:10 mein buyer ka possession-time exposure kam hota hai (sirf 10% baaki), lekin ye typically sirf strong, established builders offer karte hain. 80:20 zyada commonly available hota hai.
Demand letter aur payment schedule mein kya fark hai?
Payment Schedule overall agreed plan hai; Demand Letter builder ka specific formal notice hai jab ek particular stage complete ho aur payment due ho.
Kya payment plan builder-buyer agreement mein legally binding hota hai?
Haan, agar wo registered Builder-Buyer Agreement ka part hai — isliye verbal promises ko agreement mein likhit banwana zaroori hai.
Flexi Payment Plan kis buyer ke liye best hai?
Business owners ya seasonal-income buyers ke liye, jinhe specific months mein bade payments karne mein zyada comfort hota hai.
Kya Subvention scheme abhi bhi available hai India mein?
Kuch builders modern, better-structured tripartite agreements ke saath offer karte hain, lekin RBI ki caution ke baad ye pehle jitni common nahi hai — available hone par bhi fine print extra carefully padhni chahiye.
Possession Linked Plan mein risk kiska zyada hota hai?
Builder ka — unhe zyada tar construction khud fund karna padta hai bina buyer ke major upfront contribution ke, isliye ye plan mainly ready-to-move ya near-completion projects mein hi offered hota hai.
Kya loan disbursement demand letter ke turant baad ho jaata hai?
Nahi hamesha — bank apni technical/legal verification karta hai pehle, isliye disbursement mein kuch din se weeks tak ka gap ho sakta hai.
EMI kis formula se calculate hoti hai?
Standard reducing-balance formula use hoti hai jisme principal, interest rate, aur tenure factor hote hain — exact number apne bank ke EMI calculator se confirm karna best hai kyunki rates change hote rehte hain.
Time Linked Plan mein agar construction delay ho to kya hota hai?
Payment schedule fixed calendar dates par chalta rehta hai, construction progress se independent — isliye ye risky ho sakta hai agar timeline uncertain ho.
Kya Down Payment karne se discount guaranteed hai?
Typically builders discount offer karte hain, lekin exact % negotiable hota hai aur builder-to-builder alag hota hai — likhit confirm karna zaroori hai.
NRI buyers ke liye kaunsa payment plan recommend kiya jaata hai?
CLP ya Down Payment (sirf verified, trusted builder ke saath) — remote monitoring aur third-party site verification ke saath easier manage hota hai.
20:80 plan mein 80% kaun fund karta hai?
Typically ek NBFC ya builder-arranged financing structure, possession tak — ye essentially subvention ka modern variant hai, similar risks ke saath.
Kya builder demand letter mein extra charge add kar sakta hai?
Sirf agar wo original price sheet/agreement mein already disclosed ho — naye, undisclosed charges legally challengeable hote hain.
Payment plan choose karte waqt sabse important factor kya hai?
Apna cash-flow, builder ki financial health/track record, aur project ka RERA-registered timeline — teeno ko saath mein weigh karna zaroori hai, sirf ek factor par decision mat lo.
Glossary of Payment & Banking Terms
- CLP — Construction Linked Plan
- DPP — Down Payment Plan
- Subvention — Builder pays EMI/interest till possession
- Pre-EMI — Interest-only payment on disbursed loan amount
- Full EMI — Principal + Interest combined monthly payment
- Reducing Balance — Interest calculated on outstanding principal
- Tenure — Total loan repayment period
- Disbursement — Actual release of loan funds by bank
- Demand Letter — Builder’s formal payment-due notice
- Payment Schedule — Dated, stage-wise payment breakdown
- Builder-Buyer Agreement — Legal contract defining terms and payment plan
- Escalation Clause — Clause allowing cost increase pass-through to buyer
- Force Majeure — Clause excusing delay due to uncontrollable events
- Tripartite Agreement — Three-party (buyer-builder-bank) contract, common in subvention
- Floating Interest Rate — Rate that changes with market conditions
- Fixed Interest Rate — Rate that stays constant through tenure
- Loan Sanction Letter — Bank’s formal loan approval document
- Technical Verification — Bank’s site/construction-progress check
- Legal Verification — Bank’s title/document check before disbursement
- NBFC — Non-Banking Financial Company
- RERA — Real Estate Regulation and Development Act
- IFMS — Interest Free Maintenance Security
- PLC — Preferential Location Charge
- EDC/IDC — External/Internal Development Charge
- Possession Date — Date on which builder hands over the unit
- Cancellation Charges — Fee deducted if buyer cancels booking
- Assignment/Transfer Clause — Terms for reselling before possession
- Processing Fee — One-time bank charge for loan processing
- Prepayment Charges — Fee for repaying loan early (mostly waived on floating rate)
- Booking Amount — Initial payment confirming the unit reservation
- Loan Eligibility — Maximum loan amount a buyer qualifies for
- Credit Score — Numeric measure of borrower’s creditworthiness
- LTV (Loan-to-Value) — % of property value a bank will finance
- Construction Milestone — Defined construction stage triggering payment
- Possession Linked Plan — Majority payment due at possession
- Time Linked Plan — Payment due on fixed calendar dates
- 80:20 / 90:10 / 20:80 — Ratio-based payment plans by pre-possession vs possession split
- Flexi Payment Plan — Customized hybrid payment schedule
- Builder Funding — Developer’s own construction finance sources
- Bank Funding — Buyer’s home loan financing the purchase
- Private Equity (Real Estate) — Institutional investment funding a project
- Construction Finance — Loan taken by builder to fund construction
- Default Liability — Responsibility for unpaid EMI/interest if a party fails to pay
- RBI — Reserve Bank of India, banking regulator
- National Housing Bank — Apex housing finance regulator
- GST on Under-Construction Property — Tax applicable on under-construction (not ready) property
- Stamp Duty — State government tax on property registration
- Registration Charges — Fee for registering the sale deed
- Total Property Cost — Base price + all charges + taxes combined
- Cash Flow Planning — Mapping expected payments against expected income/liquidity
Yeh ek core 50-term glossary hai jo is chapter ke liye sabse relevant hai. Complete 200+ term glossary future update mein add ki jaayegi.
Key Takeaways
- CLP zyada tar under-construction buyers ke liye sabse balanced choice hai — risk builder ke actual progress se linked rehta hai.
- Down Payment best discount deta hai, lekin sirf verified, trusted builders ke saath karo.
- Subvention aur 20:80 attractive lagte hain, lekin default-liability clause carefully padhna non-negotiable hai.
- Pre-EMI vs Full EMI ka fark total interest cost par significant impact daalta hai — sirf monthly-outflow dekh kar decide mat karo.
- 30 builder tricks aur 30 buying mistakes mein se zyadatar avoid ho jaate hain agar har verbal commitment ko likhit banwao aur RERA-registered timeline verify karo.