Airport Link Road Mohali: GMADA’s New Corridor, Explained

Royals Property Consultant is a trusted name for buying, selling, renting, and investing in residential and commercial properties in Zirakpur, Mohali, Chandigarh, and New Chandigarh.

Airport Link Road Mohali

ROYALS PROPERTY CONSULTANT · RERA: PBRERA-CHD04-REA0390

Airport Link Road Mohali: GMADA’s New Corridor, Explained

What’s actually built, what’s still pending, and what it genuinely means for property near Airport Road — no hype, just verified facts.

🛣️ GMADA Project 📅 Updated June 2026 ✅ Fact-Checked ⭐ 5.0 Google Rated

Quick Summary

GMADA is building a new alternate road from Bawa White House crossing (Sector 65–66 junction) to Airport Crossing near Sector 66-B, running parallel to the existing Airport Road (PR-7). It will shorten the route to Shaheed Bhagat Singh International Airport by roughly 3–4 km depending on where you start from, taking pressure off the single corridor that today carries all Punjab and Haryana traffic to the airport. The project has already missed one deadline — December 2025 — and is now targeted for full completion by March 31, 2026, mainly because of a technically demanding underpass below an active railway line.

8.5–8.7 kmTotal Corridor Length
164 ftRoad Width (4-Lane)
~₹125 CrEstimated Project Cost
Mar 31, 2026Revised Completion Target
~90%Reported Construction Progress
GMADAExecuting Authority

Latest Update

GMADA Chief Administrator Sakshi Sawhney has confirmed that one stretch of the road is expected to become motorable soon, giving commuters partial relief, while full operational readiness — meaning the complete dual carriageway with the railway underpass functioning — is targeted for March 31, 2026. This is a revision from the December 2025 timeline the Punjab government had given the Punjab and Haryana High Court back in February 2025.

Is this the same as the Haryana airport road?

No. This is a Punjab-funded, GMADA-built road serving Mohali traffic. A separate, Haryana-funded road is being planned independently to serve Panchkula and eastern Chandigarh, involving defence land acquisition and a different alignment entirely.

Project Overview

DetailInformation
Project NameAlternate Airport Link Road (Bawa White House to Airport Crossing)
Executing AgencyGreater Mohali Area Development Authority (GMADA)
FundingPunjab Government, via GMADA
LengthApprox. 8.5–8.7 km (a 3.36 km segment was separately tendered)
Road Width164 ft corridor; 4-lane, 33-ft carriageway each side
Estimated Cost~₹125 crore (segment tender: ₹62.065 crore)
Starting PointSector junction 65–66 (Bawa White House)
Ending PointSector 66-B / Airport Crossing
Distance SavedApprox. 3–7 km depending on origin point
Key StructuresRailway underpass, bridge over N-Choe drain
Original DeadlineDecember 2025
Revised DeadlineMarch 31, 2026

Why This Road Was Needed

If you’ve ever driven to Shaheed Bhagat Singh International Airport during peak hours, you already know the problem. Airport Road (PR-7) is the only route available to traffic from both Punjab and Haryana. It carries airport-bound commuters, Aerocity and IT City residents, freight vehicles, Zirakpur and New Chandigarh traffic, and through-traffic heading toward Jammu & Kashmir and Himachal Pradesh — all on one corridor. Mohali’s sector-wise growth over the last decade pushed that single road well past its comfortable capacity.

GMADA’s answer was a more direct, parallel route that bypasses the loop drivers currently have to take — via the ISB T-junction, Bawa White House, and two separate turns — to reach the airport. It’s not a cosmetic widening project; it genuinely cuts a shorter line across the existing route.

Current Construction Status

As of the latest official statements, the project is in what GMADA describes as final finishing mode. Most of the embankment, carriageway and bridge work is in place. What remains is concentrated in two areas: completing the underpass beneath the active railway line, which has to be phased around train safety protocols, and finishing surfacing and waterproofing on the N-Choe bridge to prevent waterlogging in the monsoon.

Worth knowing: “90% complete” and “fully operational” are two different facts. The first is construction progress; the second is the date the public can actually use the full stretch safely. Don’t let property marketing blur the two.

Route Explained

The road starts at Sector junction 65–66, known locally as the Bawa White House crossing, and runs a more direct line than the existing Airport Road — tracking past Sector 65 and 66, crossing the N-Choe drain on a dedicated bridge, passing beneath the railway line through the new underpass, and rejoining the main airport approach near Sector 66-B and Airport Crossing. Picture the existing road as a slight loop; this new road is the straighter chord cut across that loop.

Engineering Features

Bridge Over the N-Choe

A roughly 180-metre bridge carries the road over this seasonal drain, requiring pile foundations and a deck designed to handle monsoon flow — part of why “structural reinforcement” pushed the timeline out.

Road Design

The approved design is a four-lane dual carriageway with a 33-ft carriageway on each side, inside an overall right-of-way of around 164 ft — wide enough to leave room for future service lanes without fresh land acquisition.

Railway Underpass

This is the single most demanding part of the project. Building beneath a live railway line means working around train schedules and strict safety clearances, which is the main reason the deadline moved from December 2025 to March 2026.

Drainage & Safety

GMADA has specifically flagged waterlogging prevention around the N-Choe bridge approach as part of the remaining finishing work, alongside standard lane markings and median safety features typical of recent Mohali road projects.

Traffic & Connectivity Benefits

OriginCurrent DistanceNew Route DistanceApprox. Saving
Zirakpur13.7 km9.6 km~4.1 km
Mohali (general)16 km13.1 km~2.9 km
Mohali IT Park area20 km17 km~3 km
Kalka–Shimla Highway corridor11.7 km9.6 km~2.1 km

How does this help daily commuters, not just airport travellers?

Residents of Sector 65–70 get a second access option that bypasses the Bawa White House and Airport Chowk turns — the main bottleneck during 8–10 AM and 5–7 PM. It also gives emergency vehicles an alternate route if the main road is blocked.

Beyond commuters, the road benefits logistics and cargo movement to the airport’s freight operations, hospitality and cab businesses that depend on predictable access, and corporate decision-makers evaluating Mohali for expansion — connectivity is one of the metrics multinational companies actively weigh.

Impact on Property & Real Estate

Infrastructure-led appreciation rarely happens overnight — it’s a gradual re-rating, and it often starts during construction, not after the opening, because informed local buyers price in connectivity before the wider market catches on.

What Comparable Indian Road Projects Show

CityProjectObserved Pattern
GurgaonDwarka ExpresswaySharp price moves in adjoining sectors years before full completion
NoidaNoida–Greater Noida ExpresswaySustained growth as IT and business parks followed the road
HyderabadOuter Ring RoadFaster-than-city-average appreciation near ORR-adjacent nodes
BengaluruPeripheral Ring Road (planning phase)Land banking increased years ahead of actual construction
PuneRing Road & airport connectivityResidential and rental demand rose as commute times fell

The pattern is consistent: better connectivity expands the radius of “commute-viable” locations, which widens the buyer pool and supports steady appreciation — not a price spike overnight.

Likely Impact by Mohali Location

LocationPositioningLikely Trajectory
Sector 65–66Directly on new alignmentStrongest, most direct beneficiary
AerocityAlready airport-adjacent premiumReinforces existing premium
Sector 67–70Established residential beltModerate, steady benefit
Sector 79–85Slightly removed from alignmentIndirect benefit via reduced congestion
IT City (Sector 82)Employment-driven demandSupports corporate relocation decisions
Sector 88Emerging, value-entry sectorBenefits more from overall Mohali momentum

Note: this reflects directional positioning based on geography and comparable projects — not guaranteed figures. Prices vary by project and timing; always confirm current rates with a local consultant.

Rental Market

Rental demand tends to move faster than sale prices after connectivity upgrades, since tenants — especially corporate employees — base decisions on commute convenience more than long-term appreciation. Sectors closest to the new road and IT City are likely to firm up first.

Sectors Likely to Benefit

Sector 65 & 66

Direct Alignment

Sit right along the new road’s path — the most immediate, direct beneficiaries.

Aerocity

Airport Adjacent

Already premium; this road reinforces existing connectivity rather than creating new upside.

📖 View Aerocity Guide →

IT City (Sector 82)

Employment Hub

Faster, more reliable airport access supports corporate and rental demand.

📖 View IT City Guide →

Sector 67 & 68

Established Belt

Benefit from reduced through-traffic on the shared Mohali road network.

📖 View Sector 68 Guide →

Sector 70 & 74

Indirect Benefit

Reduced overall congestion eases commute even without sitting on the new alignment.

📖 View Sector 70 Guide →

Sector 79, 80 & 85

Wider Network Benefit

Gain from a less congested broader Mohali road network rather than direct proximity.

📖 View Sector 79 Guide →

Sector 88

Emerging

Rides the overall infrastructure momentum building across Mohali’s outer sectors.

📖 View Sector 88 Guide →

Investment Guidance

The pre-completion window — visible construction progress but no official opening yet — has historically offered the most attractive entry pricing in comparable projects, because lingering uncertainty about the exact date keeps some buyers on the sidelines even as fundamentals improve. That window rewards diligence, not impulse, since this project has already slipped one deadline.

Who Should Consider Buying Now?

End-users who fly frequently, IT professionals who value a shorter commute, and investors with a 3–5 year horizon are best positioned. Buyers who need guaranteed near-term liquidity or are highly delay-sensitive should weigh the project’s track record carefully first.

Investor Checklist

  • Confirm current construction status directly with GMADA or a local consultant
  • Distinguish “motorable in stages” from “fully operational” when judging timing
  • Check RERA registration for any project marketed using this road
  • Verify the actual distance from the specific property to the new alignment
  • Avoid overpaying for a “connectivity premium” sellers may already be pricing in

Buyer Checklist

  • Visit the property and personally check commute time via both routes
  • Ask for and independently verify the project’s RERA number
  • Confirm whether marketing materials cite official GMADA timelines or guesses
  • Get an independent legal and title check regardless of the connectivity story
  • Don’t base affordability purely on an assumed completion date

Risks & What to Verify

The biggest risk is timeline uncertainty — this project has already moved from December 2025 to March 2026, and underpass work beneath a live railway line is hard to compress further if complications arise. It’s also worth knowing that a related Haryana-funded road serving Panchkula was stalled for years by inter-state disagreement — a reminder that road projects in this region can face approval delays well beyond pure engineering challenges. Always check the ground reality independently before letting a “connectivity premium” influence your offer.

Expert Opinion

👤

Manindar Verma

Managing Director · Royals Property Consultant · RERA: PBRERA-CHD04-REA0390

“What buyers consistently underestimate with infrastructure-led locations is how much of the price movement happens before the ribbon-cutting, not after. Sector 65 and 66 are the obvious early movers here because they sit directly on the new alignment. But I’d tell any client the same thing I’m telling you: verify the construction status yourself, don’t rely on a brochure’s version of the timeline, and remember this project has already missed one deadline. That’s not a reason to avoid it — it’s a reason to do your homework before you commit.”

Frequently Asked Questions

What is the Airport Link Road Mohali project?

It is a GMADA-built alternate road from Bawa White House crossing to Airport Crossing near Sector 66-B, running parallel to the existing PR-7 Airport Road to ease congestion and shorten the route to Shaheed Bhagat Singh International Airport.

When will the Airport Link Road be completed?

The original target was December 2025, as stated to the Punjab and Haryana High Court in February 2025. This has been revised to March 31, 2026, due to underpass construction beneath an active railway line.

How much distance will the new road save?

Savings vary by starting point — roughly 4.1 km from Zirakpur, 2.9 km from general Mohali locations, and around 3 km from the Mohali IT Park area, based on official inter-state figures.

Who is funding the Mohali Airport Link Road?

The Punjab Government is funding this road through GMADA. It is separate from a newer, independently funded Haryana road planned to serve Panchkula and eastern Chandigarh commuters.

Why is the road taking longer than planned?

The two main reasons are the technical complexity of building an underpass beneath a live railway line, which must be phased for safety, and additional structural reinforcement required for the bridge over the N-Choe drain.

Which Mohali sectors benefit most from this road?

Sectors 65 and 66 sit directly along the new alignment and see the most immediate benefit, while Aerocity, Sector 67–70 and IT City (Sector 82) gain from improved overall airport access.

Is now a good time to buy property near this road?

The pre-completion phase has historically offered more attractive entry pricing in comparable projects, but always independently verify current construction status before assuming the revised deadline will hold.

What happens to the existing Airport Road once this opens?

PR-7 will continue operating as the primary corridor, but a meaningful share of traffic will shift to the new alternate route, reducing congestion and improving travel-time reliability on both roads.

ROYALS PROPERTY CONSULTANT · RERA: PBRERA-CHD04-REA0390

Thinking of Buying Near Airport Road, Mohali?

Talk to Manindar Verma for a verified, up-to-date construction status and a personalised property shortlist — zero brokerage, zero pressure.

⭐ 5.0 Google Rating · 51 Verified Reviews · 500+ Families Served

Airport Link Road Mohali, GMADA Airport Link Road, Airport Link Road Mohali 2026, GMADA Project Update 2026, Mohali Airport Road Update, Alternate Airport Link Road Mohali, Phase 11 Airport Link Road, Chandigarh Airport Link Road, Shaheed Bhagat Singh International Airport Road, Airport Corridor Mohali, GMADA Infrastructure Projects, Mohali Infrastructure News, Airport Road Mohali, Airport Connectivity Mohali, Mohali Real Estate News, Mohali Property News, GMADA News, Mohali Development News, Airport Road Construction Mohali, GMADA Road Project, Mohali Smart Infrastructure, Punjab Infrastructure Projects, Airport Road Expansion Mohali, Mohali Connectivity Project, PR7 Road Mohali, Sector 65 Mohali, Sector 66 Mohali, Sector 67 Mohali, Sector 68 Mohali, Sector 70 Mohali, Sector 79 Mohali, Sector 80 Mohali, Sector 82 Mohali, Sector 85 Mohali, Sector 88 Mohali, Aerocity Mohali, IT City Mohali, Mohali Investment, Property Near Airport Road Mohali, Commercial Property Mohali, Residential Property Mohali, Property Investment Mohali, Airport Road Property Prices, Mohali Property Investment 2026, GMADA Development Authority, Mohali Urban Development, Chandigarh Tricity Infrastructure, Airport Express Road Mohali, Airport Road Real Estate, Future of Mohali Infrastructure, Best Property Near Airport Road, Mohali Growth Corridor, Airport Road Commercial Investment, New Airport Road Mohali, GMADA Phase 11 Road, Mohali Transport Infrastructure, Airport Road Travel Time, Mohali Road Network, Airport Link Road Benefits, Mohali Upcoming Infrastructure