GMADA Development & Investment Tracker 2026–2030: Mohali, New Chandigarh, Aerotropolis & Upcoming Infrastructure

Royals Property Consultant is a trusted name for buying, selling, renting, and investing in residential and commercial properties in Zirakpur, Mohali, Chandigarh, and New Chandigarh.

GMADA Development & Investment
RERA: PBRERA-CHD04-REA0390
✍ Manindar Verma, Managing Director📅 Last verified: 13 November 2026⏱ 14 min read

GMADA Development & Investment Tracker 2026–2030: Mohali, New Chandigarh, Aerotropolis & Upcoming Infrastructure

Understand Mohali’s next development corridors before making your property investment decision.

This GMADA development tracker follows official notices, road projects, land acquisition stages and affected villages across Mohali, New Chandigarh and Aerotropolis. Every entry shows its status, its source and what is still unverified. We separate what has been notified from what is only proposed, and we never present a proposed road as a finished one.

–Developments tracked
–Villages listed
–Entries with an official GMADA source
13 Nov 2026Last verified

How this GMADA development tracker is verified

Road and acquisition headlines move land prices in marketing long before anything moves on the ground. So every entry here is sorted into one of three source tiers, and you can see which one at a glance.

Tier 1: Official

GMADA notifications and public notices, Punjab Government notices and Land Acquisition Collector awards. These decide a project’s status.

Tier 2: Reputed news

Reports such as The Tribune, used for context and dates when the official document was not available to us.

Tier 3: Third-party trackers

Independent sites that republish GMADA notices. We flag these and ask you to confirm on the official page.

Honest limits

Where we could not match a detail to an official document, the card says “Status requires official verification”. The next administrative milestone is shown only if a document published one; none of the documents reviewed did. Coordinates are not shown because we have not verified them, and an inaccurate pin on a land-acquisition map can mislead. Always confirm khasra-level details with GMADA or the Land Acquisition Collector.

Proposed, notified, approved, built: four different things

StageWhat it meansWhat it does not mean
Proposed in a master planA road or sector appears in an approved planning documentLand has been acquired or a date has been set
Social Impact AssessmentThe study and hearings required before acquisition proceedsAcquisition is final
Officially notified / awardA formal acquisition notice or compensation award existsConstruction has started
Under construction / operationalWork or traffic is visible on the groundEvery stretch is finished

Status labels used on this page: Proposed or under consideration; Social Impact Assessment; Acquisition process initiated; Officially notified; Compensation or award process; Approved or sanctioned; Tender or contract stage; Construction started; Partially completed; Completed or operational. We do not use them interchangeably. Media have also reported that GMADA plans to revise master-plan road widths (Construction World), so widths shown here are as notified and may change. For the process in plain language, read our GMADA land acquisition guide.

Corridor map: where the developments sit

ChandigarhZirakpurMohaliNewChandigarhAerotropolis/ Aerocity Airport Road / PR-7 corridor links Zirakpur, Aerocity and Mohali Schematic only: not to scale, not survey-grade
Illustrative diagram. Individual roads and villages are listed in the tracker below with their official source rather than pinned, because we have not verified alignments or coordinates.

Development tracker 2026–2030

Filter by area or status, or search by village or road name. Each entry lists its status, key dates, villages, source and what to verify.

Officially notified

200-ft sector-dividing roads 96/97, 106/107 and 109/110

Location
Mohali (SAS Nagar), Tehsil Mohali
Villages
Bhago Majra, Manak Majra
Road width
200 feet (as notified)
Notification
No. 2021-6Hg1/813, dated 9 June 2025, Dept. of Housing and Urban Development
Latest update
Notification listed on GMADA’s notifications page
What to verify
Exact khasras notified, award status, construction status (not confirmed)
Social Impact Assessment

Vertical and horizontal roads in the SAS Nagar and New Chandigarh master plans

Location
Mohali master plan area and New Chandigarh master plan area
Notices
SAS Nagar: public notice on the SIA report dated 21 Apr 2026 (submissions to 15 May 2026). New Chandigarh: dated 23 Apr 2026 (submissions to 21 May 2026)
Villages
Listed in the notice PDFs; not reproduced here
What to verify
Which roads and khasras are covered, and what followed the SIA stage (not confirmed)
Acquisition process initiatedThird-party source

HR-7 road, New Chandigarh (about 1.60 km, 200 ft)

Location
Sub-Tehsil Majri, SAS Nagar
Villages
Rehmapur, Palhedi, Thaska, Teeda
Notice
Public notice reported on 4 Nov 2026 (document dated 1 Nov 2026), issued under the 2013 Act
What to verify
Confirm the notice on the official GMADA page; exact khasras; next stage
Acquisition process initiatedThird-party source

HR-6 road, New Chandigarh (about 2.80 km, 200 ft)

Location
Sub-Tehsil Majri, SAS Nagar
Villages
Rani Majra, Sangala, Bhagat Majra, Palhedi
Notice
Public notice dated 4 Nov 2026, as reported
Note
Bhagat Majra (Majri) is different from Bhago Majra (Tehsil Mohali)
What to verify
Confirm on the official GMADA page
Officially notified

VR-7, 200-ft road, New Chandigarh

Location
New Chandigarh
Notification
No. 06/17/2020-6HG1/131 (an older notification)
Villages
See the notification
What to verify
Award and construction status are not confirmed here
Compensation / award process

VR-5, 200-ft road, New Chandigarh

Location
Sub-Tehsil Majri, Tehsil Kharar, SAS Nagar
Document
Land Acquisition Collector’s Award No. 584; 8.8310 acres of five villages notified
Villages
Five villages; see the award PDF
What to verify
Possession and construction status (not confirmed)
Status requires official verification

PR-7 and part of PR-6, 200-ft master plan road

Location
New Chandigarh and SAS Nagar; Airport Road is part of PR-7
Notification
No. 6/22/2016-6HG1/903452/1 (Section 11 notification)
Reported
The Tribune reported an 8,785-m, 200-ft stretch from New Sunny Enclave to PR-4 was about 87% complete at the time of that report (undated in our copy)
What to verify
Current progress stretch by stretch
Compensation / award process

164-ft road, Kambali–Kambala–Rurka to Airport Extension

Location
Tehsil Mohali, SAS Nagar
Villages
Kambali, Kambala, Rurka
Documents
Section 11 notification No. 06/01/2021-6HG1/131 dated 8 Jan 2022; Award No. 583 dated 11 May 2023
What to verify
Possession and construction status (not confirmed)
Compensation / award process

Aerotropolis, Pockets E, F, G, H, I and J

Location
Aerotropolis, SAS Nagar
Notice
Public notice under Section 21 dated 28 Apr 2026 (submissions to 15 May 2026). Earlier notices for villages Badi and Kurdi dated 22 Jan 2026
Also reported
Aerotropolis Extension (Karala, notice dated 1 Aug 2026) and Expocity (village Niman), via a third-party tracker
What to verify
Which khasras are covered; status of each pocket
Compensation / award process

Eco City 3, New Chandigarh

Location
New Chandigarh
Reported
The Tribune (Dec 2025): GMADA acquired about 716 acres from nine villages
Notice
Public notice on consents for land pooling or cash compensation, 16 Jan to 30 Apr 2026
What to verify
No public plot scheme as of writing. Do not pay anyone claiming an allotment
Social Impact Assessment

Eco City 4, New Chandigarh

Location
New Chandigarh
Villages
Kartarpur, Kansala, Rajgarh, Boothgarh
Reported
Section 4(1) notification dated 2 June 2026 for about 526 acres (The Tribune)
What to verify
No launch, brochure or booking is officially available. At the time of writing, official details have not yet been announced by GMADA
Acquisition process initiated

Low-density project, New Chandigarh

Location
New Chandigarh
Notice
Public notice on consents for land pooling or cash compensation, 2 Apr to 29 Jun 2026
Villages
Listed in the notice PDF
What to verify
Outcome of the consent window and any scheme launch (not confirmed)
Acquisition process initiated

Commercial City Centre notices, SAS Nagar and New Chandigarh

Location
Mohali and New Chandigarh master plans
Notices
SAS Nagar public notice dated 24 Apr 2026; a separate GMADA notice covers land acquisition for the New Chandigarh Commercial City Centre
What to verify
Villages and khasras in the notice; stage after notice (not confirmed)
Acquisition process initiated

Sector 87 and Sector 101 land acquisition notices

Location
Mohali (SAS Nagar)
Villages
Sector 87: Manak Majra, Nanu Majra, Sambhalaki, Sohana. Sector 101: Dhurali
Notices
Public notices dated 12 Feb 2026
What to verify
Exact khasras and what has followed (not confirmed)
Status requires official verification

Items from our November 2026 update not yet matched to an official notice

Items
The proposed 55.21-acre Mohali acquisition for a 200-ft road, and the proposed 131-ft road in New Chandigarh (Sector 94/95 to 111/112 area)
Status
We could not match these to an official GMADA document in this verification pass, so we publish no villages, dates or status for them here
Status requires official verification

Other regional corridors: Rajpura–Banur, Landran–Banur, Ambala–Mohali, PR-8 and PR-11

Status
We have not yet verified current official documents for these corridors, so we do not describe them as approved or under construction
Related
For the rail link, see our Rajpura–Mohali railway line tracker
Looking for property near an upcoming Mohali development?

Tell us the corridor or village. We will share verified options and flag any acquisition notice that could affect a parcel.

Get Verified Options from Royals

Village-wise development intelligence

A village appearing here does not mean all its land is being acquired. Notices cover specific khasras, so always confirm the exact land details.

VillageTehsil / sub-tehsilDevelopmentStageSource
Bhago MajraTehsil Mohali200-ft sector roads 96/97, 106/107, 109/110Officially notifiedGMADA notification 2021-6Hg1/813
Manak MajraTehsil MohaliSame roads; Sector 87 notice (12 Feb 2026)Notified; acquisition initiatedGMADA notification and public notice
Nanu Majra, Sambhalaki, SohanaTehsil MohaliSector 87 notice (12 Feb 2026)Acquisition initiatedGMADA public notice
DhuraliTehsil MohaliSector 101 notice (12 Feb 2026)Acquisition initiatedGMADA public notice
Kambali, Kambala, RurkaTehsil Mohali164-ft road to Airport ExtensionAward No. 583 (11 May 2023)GMADA notification and award
Badi, KurdiSAS NagarAerotropolis land acquisition notices (22 Jan 2026)Acquisition initiatedGMADA public notices
Rehmapur, Thaska, TeedaSub-tehsil MajriHR-7, 200-ft road (Nov 2026)Acquisition initiatedThird-party report; confirm officially
PalhediSub-tehsil MajriHR-7 and HR-6, 200-ft roads (Nov 2026)Acquisition initiatedThird-party report; confirm officially
Rani Majra, Sangala, Bhagat MajraSub-tehsil MajriHR-6, 200-ft road (Nov 2026)Acquisition initiatedThird-party report; confirm officially
Kartarpur, Kansala, Rajgarh, BoothgarhSub-tehsil MajriEco City 4 (Section 4(1), 2 Jun 2026)Social Impact AssessmentThe Tribune
Mullanpur GaribdassTehsil KhararLand acquisition notice (29 Mar 2026)Acquisition initiatedThird-party tracker; confirm officially

For the broader village programme see our Greater Mohali village development plan guide and The Tribune’s report on developing villages alongside new townships.

What’s new in GMADA: latest verified updates

  • 4 Nov 2026: Public notices reported for HR-7 and HR-6 200-ft roads in New Chandigarh (third-party report; confirm on GMADA).
  • 1 Aug 2026: Aerotropolis Extension (Karala) notice reported by a third-party tracker.
  • 2 Jun 2026: Eco City 4 Section 4(1) notification reported for about 526 acres.
  • 28 Apr 2026: GMADA Section 21 notice for Aerotropolis Pockets E to J.
  • 21 and 23 Apr 2026: SIA report notices for master-plan roads in SAS Nagar and New Chandigarh.
  • 2 Apr 2026: Consent notice for the New Chandigarh low-density project.
  • 12 Feb 2026: Land acquisition notices for Sectors 87 and 101.
  • 16 Jan 2026: Eco City 3 consent window opened for land pooling or cash compensation.

Old proposals are never relabelled as approved or completed here without an official document. Deeper reading: GMADA 2026 e-auction, Land Pooling Policy 2026 and Punjab drone survey for GMADA land.

Where should you look for property near these developments?

Investors monitor corridors because connectivity can change demand over time. None of this guarantees appreciation, and the right question is always which parcel, which approvals and which timeline.

New Chandigarh

Why monitored: planned, low-density township with several road and Eco City notices.

Verified status: Eco City 3 pre-development; Eco City 4 at notification stage; HR roads at notice stage.

Consider: plots, villas, apartments. Risks: phased timelines, thin rental demand today.

New Chandigarh properties

Aerocity and Aerotropolis

Why monitored: airport-linked planned zone with ongoing acquisition notices.

Verified status: Section 21 notice for Pockets E to J (April 2026).

Consider: apartments, commercial. Risks: acquisition and legal timelines.

Luxury properties in Aerocity

Mohali sectors

Why monitored: established connectivity plus new notices for Sectors 87 and 101 and master-plan roads.

Consider: apartments, plots, SCOs. Risks: check whether a parcel lies on a notified road.

Mohali properties · GMADA properties

Rajpura–Banur and Landran–Banur corridors

Why monitored: regional highway links and institutional growth.

Status: official documents not yet verified for this tracker, so we make no status claims.

Risks: unclear timelines; verify title and land use closely.

Zirakpur and surrounding connectivity

Why monitored: established highway links and airport-corridor demand.

Risks: traffic and density in older pockets.

Zirakpur properties · Zirakpur vs Mohali vs New Chandigarh

Planning a longer horizon?

Our Tricity property investment guide and NRI property guide cover returns, financing and remote buying in more depth.

Explore property options with Royals

These links go to pages Royals already maintains. We do not show prices here. Availability changes, so ask for the current list.

Residential

Apartments, villas and plots across Mohali and New Chandigarh.

Mohali · New Chandigarh · Luxury projects

Price on request.

Land and plots

Understand plot options and checks before paying.

Best residential plots · Plot buying checks

Price on request.

Commercial and leasing

SCOs, showrooms, shops and leasing support for owners and businesses.

Commercial leasing

Price on request.

If we have no verified option for your corridor yet, use the form below to request verified property options from Royals.

Checks before you buy near a proposed corridor

  1. Search the village and khasra in GMADA notices
  2. Confirm the notification number and date
  3. Check whether the parcel lies on a notified road
  4. Confirm the stage: SIA, notified or award
  5. Verify title and ownership chain
  6. Check encumbrances and litigation
  7. Confirm land use and CLU where applicable
  8. Verify project registration on Punjab RERA
  9. Ask for the approved layout or plan
  10. Confirm authority dues are cleared
  11. Never rely on verbal road or metro promises
  12. Get a qualified lawyer to verify before paying

Read 10 documents to check before buying a plot and our RERA verification guide.

Free Smart Buyer Guide for Mohali & ZirakpurA printable checklist for verification, documents and fraud warning signs.
Download the Guide →

Why work with Royals Property Consultant

We don’t just help you find a property. We help you make a more informed property decision. Property ek baar kharedi jaati hai, decision sahi hona chahiye.

  • Ground-level Tricity market knowledge
  • RERA-registered consultancy (PBRERA-CHD04-REA0390)
  • Personalised property shortlisting
  • Site visits and negotiation assistance
  • Coordination with qualified legal professionals for documentation
  • Registration and possession support
  • Rental and resale assistance
  • NRI and remote property assistance

This is the Truth Before Transactions approach we follow with every client.

Frequently asked questions

What are the latest GMADA developments in Mohali in 2026?
Official notices in 2026 cover land acquisition for Sectors 87 and 101, Section 21 notices for Aerotropolis pockets, SIA report notices for master-plan roads, and consent windows for Eco City 3 and a New Chandigarh low-density project. Road notices for HR-7 and HR-6 were reported in November 2026.
Which villages are affected by recent GMADA acquisition proposals?
Recent notices name villages including Bhago Majra, Manak Majra, Sohana, Dhurali, Kambali, Kambala, Rurka, Badi and Kurdi, and in New Chandigarh Rehmapur, Palhedi, Thaska, Teeda, Rani Majra, Sangala and Bhagat Majra. See the village table for each source and stage.
What is the status of the proposed 55.21-acre acquisition?
We could not match this item to an official GMADA document in our latest verification pass, so we do not state a status or villages for it. Check the official notifications page and our November update, and confirm any detail with GMADA before relying on it.
What are the latest road projects in New Chandigarh?
Official records show notifications or awards for VR-7 and VR-5, and public notices reported in November 2026 for HR-7 and HR-6, each 200 feet wide. These are acquisition stages. Construction status for each road must be confirmed separately with GMADA.
What is the difference between a proposed road and an approved road?
A proposed road appears in a plan. Acquisition requires notices, an impact assessment and awards. Approved or sanctioned means formal sanction exists, and construction is a further step. Each stage is separate, so a proposal is not a finished road and not a guarantee of timelines.
Is buying property near a proposed GMADA road safe?
It can be, if the parcel is verified. Check whether it falls inside the notified land, confirm title, approvals and dues, and avoid paying on verbal assurances. Proposed roads may change in width or alignment, so treat them as possibilities, not guarantees.
Which areas should investors monitor around Aerotropolis?
Monitor the pockets named in GMADA notices, including Pockets E to J and the villages in the January 2026 notices. Read each notice for exact khasras, because acquisition covers specific land and not every parcel in a village. Verify legal status before committing capital.
What are the investment opportunities in New Chandigarh?
Options include plots, villas and apartments, with Eco City phases at different stages. Eco City 3 is pre-development and Eco City 4 is at notification stage, so neither has a public plot scheme. Weigh long timelines and thin rental demand against low-density planning.
How can I verify whether land is under GMADA acquisition?
Search the village and khasra number in GMADA’s notifications and public notices, then confirm with the Land Acquisition Collector’s office. Note the notification number and date, and have a lawyer check the exact khasras. Do not rely on a broker’s word or an unofficial map.
How do I check GMADA property notifications?
Open the notifications and public notices sections of the official GMADA website, and the Land Owners section for SIA reports and ongoing acquisition. Compare the notification number and date with what a seller tells you, and save a copy for your records.
What documents should I verify before buying land in Punjab?
Check the title chain, registered sale deed, encumbrance and litigation search, mutation and land records, applicable land use or CLU, approved plans, and any GMADA acquisition notice. Confirm dues are cleared. A qualified lawyer should verify these independently before you pay.
Can NRIs invest in Mohali properties?
NRIs and OCI cardholders can generally buy residential and commercial property under FEMA rules, but not agricultural land or farmhouses. Remote buyers usually rely on virtual walkthroughs, a specific Power of Attorney and independent legal checks. See our NRI guide and consult a lawyer and a CA.
What are the commercial investment opportunities in Mohali?
Commercial options include SCOs, showrooms, shops and offices, with demand shaped by location and footfall. GMADA has also issued notices relating to commercial city centres. Check tenancy, approvals and vacancy risk, and compare comparable rentals before buying.
How can I find pre-leased commercial property in Mohali?
Ask for the lease agreement, tenant details, rent history and the property’s approvals, then verify the tenant’s payment record. A pre-leased tag does not remove vacancy or title risk. Royals can help you shortlist and compare options through our commercial leasing service.
How can Royals help me shortlist verified property options?
Share your budget, location, property type and timeline using the form. We compare options against public project information, flag acquisition notices that may affect a location, and support site visits. Final legal verification should be done independently by a qualified professional.

Official sources and references

Tell us your goal

Tell us your investment goal. Let Royals find the right property opportunity.

Whether you plan to buy residential property, invest in land, explore commercial options or lease your property, our team will help you shortlist suitable options. Your answers open WhatsApp, ready to send.

1. What are you looking for?
Manindar Verma, Managing Director, Royals Property Consultant

Manindar Verma

Managing Director, Royals Property Consultant · RERA: PBRERA-CHD04-REA0390

Tracks GMADA notices and Tricity property across Mohali, Zirakpur, Chandigarh, Panchkula and New Chandigarh. About Royals

Planning to invest in Mohali or New Chandigarh?

Understand the development. Explore the opportunity. Make an informed property decision with Royals. Need expert guidance for buying, selling, or investing in property across Mohali, Zirakpur, Chandigarh, Panchkula, and New Chandigarh? Contact Royals Property Consultant for professional assistance and market insights.

Related reading from Royals

Disclaimer: This page is for general informational and educational purposes only and is not legal, financial, tax, investment or real-estate advice. Notices, notifications and reports are summarised from publicly available sources and may change; third-party sources are flagged and should be confirmed with GMADA. Proposed or notified roads and townships may change in width, alignment or timeline, and are not guaranteed to be built. Property prices, rental income, appreciation and infrastructure outcomes are not guaranteed. Verify title, RERA registration, land use and CLU, approvals, acquisition status, authority dues, encumbrances and litigation with the relevant authority and qualified legal and financial professionals before paying any amount. Last verified 13 November 2026.